Well after finishing the repairs to the near side door, we too it to the car and have test fitted it. the alignment looks pretty close which we are happy about, so far the body is pretty loose and should all come good in the end.
Other progress made this week was more painting, this time the fuel tank has had a coat of chassis black paint and is bolted back in to place. It will be coming out again soon so we can bolt in the inner sills then should remain in place. I have also purchased new filler hose, filler neck and breather pipe.
Also have purchased a number of electrical items, including battery cable, an x-eng x-fan thermostat and a set of Carling Contura II switches for controls of some circuits that will be added in the future.
The plan for the next couple of weeks is to prep and paint the roof, fit the x-fan and look to get the battery hooked up and test the circuits.
Wow, impressive fabrication yet again!