Well its been a few weeks since the last updates on the blog and boy have things moved on recently!
With the long bank holiday weekend ahead progress started on Thursday evening, the removal of the tub rear cross member, this has been replaced with a stainless steel and riveted in place. Also fitted are 3 x britpart tub floor supports and new rear quater pannels from the same material as the tub for car 2.
Then it was time for primer and top coat, as bright as the bulkhead looked the tub shows it off even more but it still looks good.
A second coat will be added then black cappings rivetted back on.
Also the repair for the battery box has been put back in to the seat box. this will be bolted on to the tub soon.
Excellent job as usual, love the colour, very vivid 🙂