So today has been a very productive day,
We painted all the tub cappings, put them back on the tub and riveted them in with nearly 180 rivets. We then fitted the tub to the chassis and bolted into place. Before this, we fed the new wiring loom through the chassis, once the tub was fitted we then fed the loom into the tub.
All the brake lines are fitted apart from the master cylinder and the splitter.
All the steering components are fitted together
Next on the agenda is to sort out the seat box and front flooring and get that fitted into place.
Then we will have the fun with the wiring and try to get the engine running…