Car 4 : Start of Rebuild

Well since the beginning of April the car ran out of tax so it was decided to undergo a restoration rebuild like the other cars we have been working on.

Over a couple of days the car was stripped down to a bare chassis, as the build had been planned for a couple of weeks some parts had been ordered so work could begin.

Strip down didnt take too long. The previos owner had a strange obsession with “denso tape” a horrible sticky material based tape. Every not and bolt and bracket was covered in it… initially this was thought to be a nightmare… but in practise, it made stripping down very easy as once removed, it had preserved the nuts and bolts very well… no rusty bolts!
image

Before strip down… the car was fully road worthy… driven into the garage on friday night.
image

image

image

First step was axle removal… very easy with a 9 inch grinder. All springs, bolts and shackle plates being replaced anyway.
Next step… bodywork.
image

image

image

image

image

image

image

image

image

image

image

image

Next stage was engine removal… with the assistance on the engine crane thus was an easy job. The owner of the series 2 however did find an interesting way to lower the engine down onto the pallet.
image

image

A good weekends work. By sunday night we had a bare chassis.
image

 

Advertisement

2 thoughts on “Car 4 : Start of Rebuild

    1. landyrebuilds Post author

      Thanks. The chassis was actually quite rough to be honest… it needed a few repairs. I’ll get round to loading up that update when I get a minute. Its all nice and straight now though.

      Reply

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s