Last week showed yet more progress on the car, the tub was bolted down to the chassis fully, the sides and roof were bolted down to the tub and the inner sills put in place, so the shape of the car is now fixed. with it being mostly covered we then moved on to other jobs that were needed.
Over the weekend we started to look at the wiring of the car, the autosparks loom is set up on the car and now just needing to find where the connections go to.
So far we have the start system set up so with a key we can turn the engine over, next up will be making sure the warning lamps for the engine work. When the engine wiring is all done and we are happy we can then progress to fitting the wings and lights.