Monthly Archives: December 2015

Series 2a (Duck) 

More progress has been made with the green machine, we have now fitted all the body panels except the sill fronts, everything is now painted and now were faffing with lining up the shut lines on the doors, 

Things left to do are:
Floor panels

Rear seats and belts

Front seats and cubby box

Dash and its wiring

Airbox mounting

Passenger door seal

Sill fronts

Wheels 

Mot. 👍 

   
    
    
    
 

Advertisements