Car 4 : Update on rebuild

Well this is a quick update on progress of car 4’s rebuild, there has been so much done to be documented fully.

Front axles rebuilt fully

Chassis rubbed down, repaired & painted

Front & Rear springs replaced with parabolic springs & new shocks fitted

Bulkhead – stripped, repaired, primed, painted, rebuilt & refitted

Front Grill panel – stripped, repaired, primed, painted and refitted

Engine – refurbished, refitted and running.

New exhaust system fitted

Wings & bonnet have been rubbed down primed, painted and fitted

Hopefully we will get a more detailed update with photos soon.

UPDATE:

Over the weekend we did enough work that the engine now fires up using the key and the car has had a short drive around the garden to give it a little test and move around under the car port.

Most of the front electricals have been sorted now.  Side, Dipped, Main and indicator lamps all work, along with the horn.  so left to wire is the washer pump and heater motor.  A rear chassis loom has also been made and will be plugged in tonight and tested for the rear lights.  The next big step is getting the panels all lined up before they get painted and any holes than need drilling can be put in.

Advertisement

Car 4 : Start of Rebuild

Well since the beginning of April the car ran out of tax so it was decided to undergo a restoration rebuild like the other cars we have been working on.

Over a couple of days the car was stripped down to a bare chassis, as the build had been planned for a couple of weeks some parts had been ordered so work could begin.

Strip down didnt take too long. The previos owner had a strange obsession with “denso tape” a horrible sticky material based tape. Every not and bolt and bracket was covered in it… initially this was thought to be a nightmare… but in practise, it made stripping down very easy as once removed, it had preserved the nuts and bolts very well… no rusty bolts!
image

Before strip down… the car was fully road worthy… driven into the garage on friday night.
image

image

image

First step was axle removal… very easy with a 9 inch grinder. All springs, bolts and shackle plates being replaced anyway.
Next step… bodywork.
image

image

image

image

image

image

image

image

image

image

image

image

Next stage was engine removal… with the assistance on the engine crane thus was an easy job. The owner of the series 2 however did find an interesting way to lower the engine down onto the pallet.
image

image

A good weekends work. By sunday night we had a bare chassis.